Oakley Fertilizer
Dry fertilizer building alongside the North Little Rock port. This included site work, cast in place concrete, tilt up concrete, column, and flatwork. Tilt-up concrete construction is the perfect balance between durability, speed, and investment. This method was used to aid in the completion of 20’ x 16’’ concrete walls. Our concrete walls were built and cast on site. When the walls were ready, they were tilted and craned into a vertical position and set on footings and wall sections where they formed the external structure of the building.