Burlington, Iowa

Burlington Flood Wall

The primary intent of this project was to reduce damages from flooding and the secondary intent was to improve Burlington's riverfront and downtown space. The wall is designed to handle up to 28.5 feet of water. To withstand the external force, the wall consisted of massive footings. The river level and ground water table made this project a challenging yet satisfying completed build.

Project Date

July 2018

Ready to
build with
tck concrete?

GET A QUOTE

Location

Build with 
tck concrete

GET A QUOTE

Follow us on Social Media

Copyright © 2026 TCK CONCRETE. All rights reserved.
linkedin facebook pinterest youtube rss twitter instagram facebook-blank rss-blank linkedin-blank pinterest youtube twitter instagram